What to include in a deck staining estimate

Build the estimate from the surfaces included, the preparation they need and the visits the coating requires. Follow this fictional deck-floor example through quantities and scope, then enter your own local labor rate and supplier prices.

By the Full Service Pro team · · Updated

Download the deck staining worksheet

Free CSV · No signup · No formulas or macros. Use your own quantities, prices and terms.

Sample jobs are fictional. Use your own job details, local labor rates and supplier costs.

Measure the scope and state what is excluded

The example deck floor measures 12 by 16 feet: 192 square feet. This quote covers that floor only. Rails, posts, stairs, the underside and adjoining fencing are excluded. If the customer wants them coated, measure and price them separately rather than treating the floor area as their quantity.

Record the existing finish and substrate condition at the visit. The example assumes the chosen product’s preparation can be completed without stripping an incompatible coating or replacing boards. Those assumptions need checking on the real deck.

Turn the coating instructions into a quantity

For arithmetic only, assume two coats and coverage of 200 square feet per gallon per coat. These are fictional planning inputs, not a specification for any product. Use the selected manufacturer’s instructions for the real coat count, coverage, preparation and drying conditions.

The calculation is 192 square feet × 2 coats ÷ 200 square feet per gallon = 1.92 gallons. Buying two one-gallon containers would cover that calculated quantity without an added waste allowance. Check the actual surface, product guidance and your job records before deciding the purchase quantity. Multiply the containers required by your current local supplier price.

  • Included coated area: 192 square feet of deck floor.
  • Example coats: 2. Example coverage: 200 square feet per gallon per coat.
  • Calculated coating: 1.92 gallons. Example purchase: 2 gallons.
  • Coating purchase calculation: containers required × your local price per container.

Explain the labor inputs before adding them

The fictional estimate allows six preparation hours and four coating hours. These hours are selected to demonstrate the worksheet, not a production standard. For an actual job, start with the inspected preparation tasks and comparable completed-job records. The six-hour preparation example covers protecting nearby surfaces, washing and rinsing the floor with a product-compatible cleaner, and the planned travel, setup and cleanup. Drying wait is elapsed time, not six hours of paid continuous work. Add sanding or other preparation only when inspection and the selected instructions call for it.

The plan has one preparation visit and two coating visits. All three visits’ travel, setup and cleanup are included in those ten labor hours; they are not added again. The product and conditions determine when each coating visit can occur. A different visit plan changes the labor allowance.

Build a shopping list for compatible cleaner, masking and protection, applicators and cleanup supplies. Record the quantity and your local supplier price for each item. Add those line amounts to calculate consumables; do not insert an unexplained flat allowance. Specify any material markup according to your pricing policy and use your own selling labor rate.

  • Preparation labor: 6 example hours × your hourly selling rate.
  • Coating labor: 4 example hours × your hourly selling rate.
  • Coating: 2 example containers × your local price per container.
  • Consumables: sum of each item’s quantity × its local unit price.
  • Subtotal before any applicable tax: preparation labor + coating labor + coating purchases + consumables, with any stated material markup.

Write the customer-facing scope

Scope wording for this fictional example, with fields still to fill and product requirements to confirm before quoting: “Wash and rinse the 192-square-foot deck floor using a compatible cleaner; protect adjacent surfaces; allow the required drying; apply two coats in two coating visits; clean up. Product: [selected product]. Color: [selected color]. Material pricing basis: [fixed component or allowance adjusted to actual cost]. Preparation and coating visits include travel and setup. Rails, posts, stairs, underside, adjoining fencing, stripping and board replacement are excluded.”

Before sending a real quote, replace the example coat count with the selected product’s requirement and fill in the product, color and actual preparation method. Specify whether the material figures are fixed-price components or allowances adjusted to actual cost. Do not leave that distinction for the invoice. The example is not ready to send until those product choices and their instructions confirm the preparation, coverage and two-coat plan.

If inspection before quoting reveals failed coating or damaged boards, revise the plan before using this arithmetic. If a new condition appears during preparation, a change note can read: “Preparation exposed an area requiring stripping, which this scope excludes. Work on that area is paused pending your written approval of a separate scope and price.”

Plan the visits and compare the finished job

Keep the product label or technical instructions with the estimate. Agree how a weather or drying delay will be communicated, and check readiness before each visit rather than promising dates from the calendar alone.

After completion, record actual preparation hours, coating hours, visits and purchased and unused coating. Compare each with its own estimate input. If preparation took longer, retain the surface condition and task that caused it; that is more useful for the next quote than increasing every deck’s price by an unexplained percentage.

The CSV includes the complete fictional calculation and blank rows for your inputs. It contains no automatic spreadsheet formulas; its calculation column is descriptive text: review the arithmetic after changing a quantity. A selling labor rate may already include overhead and margin; do not add the same component twice.