How to price the selected repairs in a home inspection report
Choose the inspection items the customer wants repaired, then turn each finding into a scope you can assess and price. Keep the report reference attached to the estimate, approval and completion record.
By the Full Service Pro team · · Updated
Download the inspection repair worksheet
Free CSV · No signup · No formulas or macros. Use your own quantities, prices and terms.
Sample jobs are fictional. Use your own job details, local labor rates and supplier costs.
Select the work before estimating it
An inspection report describes findings; it is not an instruction to repair every item. Ask the customer to identify the selected references. Confirm the property, report date, approving customer, invoice recipient and requested completion date. A person arranging access may not be authorized to approve the work.
Our fictional example starts with report item 7.3: the bedroom-two interior door does not latch. Keep 7.3 on the estimate and photographs so it cannot be confused with a different door.
Separate the finding from the proposed repair
A door that will not latch could need adjustment, replacement parts or work on the opening. Inspect the condition before offering a fixed repair result. If that assessment has not happened, price the assessment separately and say what decision it will produce.
In this example, the site assessment supports attempting adjustment of the existing hinges and strike. The proposed work retains the door and hardware. Frame repair, replacement parts and painting are excluded. That is a narrower scope than “repair door.”
Write the allowance and the stop rule together
Use the following fictional job to define the scope, then fill in your own local rates and authorized limits before sending it. The two-hour planning allowance illustrates the record; it is not a measured production rate. Prices vary by area, job conditions and business costs.
- Reference and location: report 7.3; bedroom two.
- Work: inspect and adjust existing hinges and strike; check normal latching; protect and clean the immediate work area.
- Labor: actual billable time, including the agreed share of travel, setup and cleanup, at [your hourly selling rate], authorized up to [your assessed hour limit]. The example hour limit is two.
- Consumables: actual usage, authorized up to [your locally priced consumables limit].
- Maximum authorized subtotal before tax: assessed hour limit × your hourly selling rate + your consumables limit.
- Excluded: replacement hardware, frame repairs and painting.
- Stop rule: if the adjustment is unsuitable or the allowance is reached, stop and request approval of a revised scope. Time already spent and consumables used remain chargeable under this example’s stated terms; no extra work is authorized.
- Finish check: the door closes and latches under normal operation without being lifted or forced.
Check the estimate against the visit plan
For the two-hour example, the authorized subtotal limit is (2 × your hourly selling rate) + your consumables limit. If actual billable time is 1.5 hours, the invoice calculation is (1.5 × that agreed rate) + actual consumables, subject to the agreed limits. This is a capped time-and-materials arrangement, not a fixed-price guarantee of a successful repair.
The labor allowance here includes this item’s share of travel, setup and cleanup. Your own estimate may price mobilization separately; if so, show it and avoid charging the same allowance twice. Add other selected report items as separate lines and identify any different trade or return visit.
Use job records and the inspected scope to choose your real allowance. When the cause is uncertain, more invented precision will not make the estimate reliable.
Keep the approved scope through completion
Have the customer review the scope, limit, exclusions and stopped-work terms before scheduling. If the site condition changes, retain the original estimate and the separately approved revision.
A completion note can say: “Report 7.3, bedroom two: adjusted existing hinges and strike; door latched during normal operation; no replacement hardware used. Billable time: 1.5 hours including the agreed travel/setup share. Consumables: recorded on the attached cost sheet. See 7.3-after.jpg.” Apply the agreed local rate and recorded materials to calculate the invoice.
The download contains the allowance, the completed-work calculation and blank rows. Keep the two sample cases separate: they explain the same job at different stages, not amounts to add together. Describe outstanding findings clearly and do not label the repair independently inspected unless that review occurred.