What to put on a repair punch list

Give each repair its own reference, location and finish condition. A useful punch list lets a helper find the work, perform the agreed repair and show a reviewer what changed.

By the Full Service Pro team · · Updated

Download the punch-list checklist

Free CSV · No signup · No formulas or macros. Use your own quantities, prices and terms.

Sample jobs are fictional. Use your own job details, local labor rates and supplier costs.

Turn one request into a usable repair item

“Fix the bathroom cabinet” leaves the repair and finish open to interpretation. In this fictional turnover, the existing cabinet door rubs its neighbor. The customer wants it adjusted, with no replacement hardware or painting included.

Here is the completed starting record for that item. Alex and Casey are fictional names; replace them and the scope with the actual job details.

  • Reference: P-01. Location: hall bathroom, left cabinet door.
  • Agreed repair: adjust the existing door so it opens and closes without rubbing.
  • Excluded: replacement hinges, repairs to damaged mounting holes and finish repairs.
  • Assigned owner: Alex. Access: Casey will provide the unit key at arrival.
  • Before photo: P01-before.jpg, showing the cabinet and rubbing edge.
  • Status: Open. Next action: Alex checks the mounting and confirms adjustment can address the rubbing.
  • Reviewer: Casey. Finish condition: the door works normally without rubbing and the mounting remains secure.

Keep the repair reference with every handoff

Put P-01 in the estimate, photo names and completion note. If another worker takes over, they can find the same item without interpreting a group-text conversation. Give a sticking bedroom door P-02 and a wall patch P-03; neither belongs inside the cabinet item.

Before departure, confirm the address, access, materials and any prerequisite visit. For a patch that must dry before painting, record the next visit as a dependency rather than leaving the item marked complete.

Record a new finding before changing the work

Suppose Alex finds a hinge mounting hole that will not hold its screw. That condition is outside P-01’s adjustment scope. Set the item to Waiting for decision and retain the original scope. A possible message is: “P-01 cannot be completed by adjustment because the upper hinge mounting will not hold. The photo is attached. I will send a separate repair scope and price before continuing.”

Record the proposed added work and approval separately. A request to provide a price is not approval to perform it. Name the person who will resolve the question and the next action so the item does not disappear from the list.

Show completion before recording acceptance

For the straightforward adjustment, Alex’s completion note could read: “P-01: adjusted the existing door; checked normal opening and closing; no rubbing observed; mounting secure. No hardware replaced. See P01-after.jpg.” Take the after photo from a comparable position and add a detail view if the repair cannot be judged from the wider image.

Alex marks P-01 Ready for review. Casey checks it against the agreed finish condition, then records Accepted and the review date, or returns it with a specific remaining problem. A photograph identifies the work; it does not by itself prove that a moving part operates correctly. In the worksheet’s completed fictional record, Casey checks operation and secure mounting and records acceptance on November 14, 2026. The three example rows show stages of the same item, not three repairs or charges.

  • Open: the work has not started.
  • Waiting for decision: a named person must resolve an issue before work continues.
  • Ready for review: the worker has recorded completion and evidence.
  • Accepted: the designated reviewer has checked the agreed result.

Reconcile the list with the invoice

Before invoicing, compare each repair reference with the accepted estimate and approved additions. Identify any uncompleted or deferred items and apply the job’s agreed billing terms. Retain the completion notes and any credits with the invoice record.

The CSV includes P-01 both at the handoff and ready-for-review stages, plus a blank row. Those two sample rows illustrate a status change; they are not two billable repairs. In your working list, update one item or keep its history in a separate log.

Try the sample with a helper before using a new system: ask them to find the cabinet, explain the excluded work and identify who makes the next decision. If they need to guess, improve that field before adding more status labels.